ADU FAQ
Do I need to live in my home to build an ADU?
Standard ADUs have no owner-occupancy requirement in California. JADUs require owner-occupancy only if they share sanitation with the primary dwelling. JADUs with independent bathrooms have no owner-occupancy restriction.
Do I need to live in my home to build an ADU?
For standard ADUs, California has no owner-occupancy requirement. JADUs require owner-occupancy only if the JADU shares sanitation facilities with the primary dwelling. If the JADU has its own independent bathroom, there is no owner-occupancy requirement.
How long does the ADU permit process typically take?
Under AB 130, agencies must render a decision within 60 days. SB 543 mandates a 15 business day completeness check. In practice, LADBS processing times can vary based on workload and project complexity. The LADBS Standard Plan Program may reduce the plan-check phase by using pre-approved designs that have already passed structural and code review.
Do I need to provide additional parking for my ADU?
In most cases, no. California law generally exempts ADUs from additional parking requirements when the property is within half a mile of public transit, when the ADU is a garage conversion, or when on-street parking permits are available. These exemptions cover the majority of properties in the City of Los Angeles.
What is the maximum ADU size allowed?
For detached ADUs, state law generally allows up to 1,200 square feet. Attached ADUs are typically limited to 50% of the existing home’s floor area or 1,000 square feet, whichever is less. JADUs are capped at 500 square feet. Height limits are generally 16 feet for single-story and 18 feet for two-story (with a 2-foot additional allowance for roof pitch in some cases). Specific limits may vary by local overlay zone.
Are there grants or financing options for ADU construction?
Yes. CalHFA offers a $40K forgivable loan for qualifying California homeowners, subject to funding availability and eligibility requirements. Beyond grants, common financing options include home equity lines of credit (HELOC), cash-out refinancing, and construction-to-permanent loans. With SB 543 eliminating all impact fees, the upfront cost barrier has been significantly reduced. Our team can help you understand which options may apply to your situation.
Does NP Line Design handle the entire ADU process?
Yes. We provide full-service ADU construction from initial feasibility assessment and zoning analysis through design, permitting, construction, inspections, and certificate of occupancy. One licensed team manages every phase so you have a single point of accountability throughout the project.